© 2018 by armata home

I'm busy working on my blog posts. Watch this space!

Please reload

Follow Us

June 28, 2017

The images below show construction in progress of a triple garage. For a full size image click the small image.


The first images show the blockwork and brickwork.
 

Next, the floor is prepared for a new concrete floor.

The roof trusses are fitted to the garage.


Please reload

  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square

June 28, 2017

Please reload

Recent Posts
Search By Tags
Featured Posts

Insulation, Dry Lining and Plastering

January 16, 2018

1/3
Please reload

Archive
Please reload