© 2018 by armata home

I'm busy working on my blog posts. Watch this space!

Please reload

Follow Us

August 30, 2018

The photos below show the process we went through to create foundations for the new apartments we are building. An amount of groundwork preparation and levelling was already complete.


 

Using laser levelling equipment with satellite and GPS coordinates, the setting...

Please reload

  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square

June 28, 2017

Please reload

Recent Posts
Search By Tags
Featured Posts

Insulation, Dry Lining and Plastering

January 16, 2018

1/3
Please reload

Archive
Please reload